Without interrupting one single meal, MPS Construction and Design renovated the largest private hospital in San Antonio’s Main Dining Facility public spaces. This project entailed the demolition and replacement of the entire ceiling while keeping the facility in operation. Now Methodist Hospital has a new food service line, new service equipment, new cashier’s stations and new dining areas.
MPS Construction undertook a remodel and expansion of the OB Department & Triage areas at Methodist Hospital in San Antonio. MPS Construction and Design renovated an eight bed triage unit that serves the Women’s Center at Methodist Hospital. This project became a building addition and new construction project that culminated with eight triage beds and a nursing station. This project utilized all our expertise in working around staff and patient needs as we accomplished this in only 6 weeks!
MPS Construction Design worked with Methodist Hospital on a complete redesign and renovation of the main entrance lobby. This project entailed demolition of the main entrance, a major addition to and total renovation of the existing lobby space including the exterior facade, new AV services and reception, information, and volunteer desks.
The Adult Emergency Room renovation by MPS Construction and Design was a complete multi-phase renovation including exam rooms, waiting room, and triage area. At all times, the hospital kept the emergency room in operation. MPS worked with the Emergency Department to complete this renovation in phases so as to not compromise the ongoing operations.
MPS handled all construction for the ZOE Garden and Ante-Partum addition to the Women’s Center. Upon completion, The Women’s Center saw an addition to the breezeway between Labor and Delivery ante-partum and the entrance to the Women’s Center as well as the addition of a half dozen ante-partum rooms for new mothers.
MPS Construction and Design was engaged by Methodist Hospital to renovate the existing Labor and Delivery floor at The Women’s Pavilion, the largest in San Antonio. This multi phase project involved 40 patient rooms. MPS worked with the hospital to keep the Labor and Delivery department open by renovating 10 rooms at a time.. This project included a medical gasses upgrade, fire alarm and suppression installation, total finishes and nursing stations.
Rather than hiring a vertical transportation service provider, Methodist Hospital turned to MPS Construction and Design for their visitor elevators. MPS renovated three elevator cabs, yet kept complete access to the hospital using this elevator block. MPS called on their design team to create special finishing ensuring that the renovated elevators matched existing main lobby decor.
The Air Handling Unit for the Surgical Suites at Methodist Hospital includes climate control, filtering, humidity processing and monitoring. MPS tore out 2 air handlers and installed system including rebuilding one air handler over the Christmas holidays. We were able to install 7 reheaters, new controls, fire alarms and a new fire suppression system. MPS kept all operating rooms up and running at all times with no disruption to the operating surgical suites.